Hoisting Plan for a Conveyor Sled

PROJECT DETAILS

Project Overview

This project involved the development of a hoisting plan for lowering a conveyor sled
through a mineshaft into an underground potash facility. The plan accounted for the
unique challenges of transitioning the sled from a horizontal transport position to a
vertical orientation for safe lowering, while ensuring compliance with mine safety
requirements and hoisting envelope restrictions.

Hoisting Plan for a Conveyor Sled

Main Objectives of the Project

The main objectives of the project were to:

  • Confirm that the conveyor sled could be safely lifted, rotated, and lowered
    through the mineshaft within the prescribed envelope.
  • Analyze lifting lugs and the sled structure for stresses during horizontal lift,
    rotation, and vertical hanging conditions.
  • Provide a detailed hoisting procedure for both installation and future removal of
    the sled at the potash level.

Project Description

The project team engineered a comprehensive hoisting plan to support the safe
installation of the conveyor sled. The work included structural and lifting analysis of the sled and its lugs to confirm load-bearing capacity under multiple orientations. Special consideration was given to the rotation sequence required to transition the sled from horizontal transport to vertical alignment, ensuring that all forces remained within allowable limits. The plan confirmed that the sled could hang securely within the defined lowering envelope specified by the mine. The reverse procedure was also documented to facilitate the safe removal of the sled from the underground level at the end of its service life. The final deliverable included  engineering analysis, lifting configurations, and step-by-step hoisting instructions to guide field execution.

Project Information
Project Title:
Hoisting Plan for a Conveyor Sled
Project Timeline:
1 month
Category:
Lift Plan
Sub Category:
Underground Lowering
Industry Type:
Mining

VIEW MORE

Related Project

Structural Engineering Design of New Spiral Mill Walkway Structure

Lifting plan for Miner Components

Structural Engineering Design of an Access Catwalk

Structural Engineering Design of New Spiral Mill Walkway Structure

Mechanical Engineering Design of Pump Box Model

Structural Engineering Design of an Access Catwalk