Tank Lifting Analysis

PROJECT DETAILS

Project Overview

This project involved performing a lifting analysis for a tank to verify the adequacy of the tank structure and designated lifting points during hoisting. The focus was on the lifting phase only, as operational loading was outside the scope of this work.

Main Objectives of the Project

The main objectives of the project were to:

  • Analyze the tank structure and lifting points under anticipated hoisting loads.
  • Use finite element analysis (FEA) to assess stresses and confirm structural adequacy.
  • Provide deliverables in the form of a drawing set and engineering report documenting the analysis and lifting recommendations.

Project Description

The project team applied finite element analysis to evaluate the structural response of the tank and its lifting points during hoisting. Detailed engineering checks were carried out to ensure the tank could be safely hoisted using the specified lifting points. The final deliverables included a comprehensive drawing set outlining the lifting arrangement and a supporting engineering report summarizing the analysis, methodology, and conclusions.

Project Information
Project Title:

Tank Lifting Analysis

Project Timeline:

3 Months

Category:

Lift Plan

Sub Category:

Hoisting/Lift Design

Industry Type:

Industrial